Torc Contracts delivers fully compliant fire-stopping installations as an integrated part of our drylining and internal fit-out packages. All works are carried out using third-party UKAS–accredited systems certified through IFC, ensuring materials, installation methods, and documentation meet recognised UK standards.
Our fire-stopping operations cover the treatment of service penetrations, linear gaps, cavity barriers, fire-resisting walls and ceilings, structural interfaces, and perimeter sealing requirements. Each installation is completed in accordance with the manufacturer’s tested details and the fire strategy for the building, with clear documentation to support Building Control approval.







